Coronavirus Update/ Returning to the Office: AEI's is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

VAME Community Living Center, Togus, Maine

Augusta Maine’s VAME Togus is transitioning aging veterans in their care to new “Small House” Community Living Centers (CLC). AEI performed mechanical, electrical, plumbing and fire protection design and construction administration services for the first phase, which includes the construction of two new 8,500 SF prototype houses. The residents are veterans in need of institutional … Read more

Massachusetts State Archives Building Vault HVAC Upgrades, Boston, Mass.

AEI provided engineering design and CA services to replace the existing HVAC equipment serving the archive vaults at the Massachusetts State Archives Building. When the building generator stopped working, AEI specified and rented a temporary generator to maintain power immediately before designing a new permanent generator. Phasing management enabled building power to be maintained during … Read more

Arlington Community Safety Building, Arlington, Mass.

After completing a masterplan that involved an inspection of existing systems and the conceptual identification of required upgrades and cost estimates, Architectural Engineers commenced MEP/FP design and CA services in two phases to allow continued occupancy throughout construction. The ADA compliant building features holding cells with a sally port, a fitness center, a briefing room/training … Read more

Palmer Senior Center, Palmer, Mass.

Architectural Engineers provided mechanical, electrical, plumbing and fire protection engineering design services for the phased renovation of the Palmer Senior Center.  Phase one consists of renovation of the ground floor and the addition of handicapped upgrade to the building. Upgrades included installation of a new elevator, new toilet rooms and fire alarm upgrades. The building … Read more

Sharon Town Hall, Sharon, Mass.

The Town of Sharon engaged a design team to determine the feasibility of modernizing its town hall for accessibility and code compliance, improvements to space utilization, and energy efficiency. After the study phase, the town elected to demolish the existing building and build a new facility in its place. AEI participated in the study, and … Read more