Coronavirus Update/ Returning to the Office: AEI now IMEG is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI now IMEG's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.
Markets
Services
Features
Armed Forces Reserve Center, Middletown, Conn.
This project is an ACEC/CT Grand Conceptor Engineering Excellence Award winner.
Architectural Engineers designed the HVAC, plumbing and fire protection systems for this two-building LEED Gold project. AEI integrated energy recovery equipment, high-efficiency gas fired boilers, solar-thermal domestic water heating and demand control ventilation as part of achieving a 30% energy savings below the ASHRAE base system. The project was modeled using Revit software with the model being exported to trade contractors for estimating, shop drawing preparation, and for use in laying out systems and equipment in the field.