Coronavirus Update/ Returning to the Office: AEI's is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Markets
Adaptive Reuse
Airport
Commercial/Mixed Use
Federal/Military
Healthcare
Higher Education
Historic Renovation
K-12/Daycare
Municipal/DPW
Public Safety
Recreation/Culture
Science/Technology
Structured Parking
Transit
Services
Mechanical Engineering
Electrical Engineering
Plumbing Design
Fire Protection Engineering
Lighting Design
BIM
Sustainability/Resiliency
Low Voltage Electric
Features
Accelerated Schedule
Accessibility
BIM/Revit
C149 / C149A
Certified Study
Feasibility Studies
Historical Renovations
House Doctor
In Construction
In Design
Phased Construction
New Construction
Prime
Occupied
Sustainable
Search

Assabet Valley Vocational Technical High School, Marlborough, Mass.

AEI provided electrical engineering services related to the testing and evaluation of electrical feeders in the existing 410,000 SF high school. The study assessed the feasibility of reusing feeders for the unit substations and panelboards, and determined the necessity of electrical upgrades including switchboard and panelboard replacements. Design involved lighting, power and emergency power generation and affected classrooms and science laboratories throughout the school.  All work was coordinated to occur in the evenings and on the weekends so as not to interfere with classes and the safety of the student population.

OWNER

Assabet Valley Regional Technical School District

CLIENT

Design Partnership of Cambridge (Now Perkins Eastman)

CONSTRUCTION COST

$63M

SIZE

410,000 SF

AEI SERVICES

Electrical
Low Voltage Electric

PHASES OF DESIGN

Feasibility Study
Schematic Design
Design Development
Construction Documents
Construction Administration