Coronavirus Update/ Returning to the Office: AEI's is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Markets
Adaptive Reuse
Airport
Commercial/Mixed Use
Federal/Military
Healthcare
Higher Education
Historic Renovation
K-12/Daycare
Municipal/DPW
Public Safety
Recreation/Culture
Science/Technology
Structured Parking
Transit
Services
Mechanical Engineering
Electrical Engineering
Plumbing Design
Fire Protection Engineering
Lighting Design
BIM
Sustainability/Resiliency
Low Voltage Electric
Features
Accelerated Schedule
Accessibility
BIM/Revit
C149 / C149A
Certified Study
Feasibility Studies
Historical Renovations
House Doctor
In Construction
In Design
Phased Construction
New Construction
Prime
Occupied
Sustainable
Search

Brooke 2 Charter School, Mattapan, Mass.

Brooke 2 Charter School is an urban charter school providing an elementary education to students in levels K-8. AEI provided sustainable mechanical, electrical, plumbing and fire protection design services for a full, 57,000 SF renovation that included the replacement of the electrical distribution system as well as internal and site lighting and the installation of new lighting controls. AEI also designed  HVAC, plumbing, fire protection, security, and tel/data systems. Construction documents were developed in Revit from an integrated building information model. The project was constructed under the c149A CM@risk delivery method, and achieved LEED Silver.

OWNER

Brooke Charter School

CLIENT

Arrowstreet

CONSTRUCTION COST

$11M

SIZE

57,000 SF

AEI SERVICES

Mechanical
Electrical
Plumbing
Fire Protection
Lighting
BIM
Sustainability
Low Voltage Electric

PHASES OF DESIGN

Schematic Design
Design Development
Construction Documents
Construction Administration

SUSTAINABILITY

LEED Silver

PROJECT FEATURES

BIM/Revit
Sustainability
c149A CM@Risk