Coronavirus Update/ Returning to the Office: AEI's is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Markets
Adaptive Reuse
Airport
Commercial/Mixed Use
Federal/Military
Healthcare
Higher Education
Historic Renovation
K-12/Daycare
Municipal/DPW
Public Safety
Recreation/Culture
Science/Technology
Structured Parking
Transit
Services
Mechanical Engineering
Electrical Engineering
Plumbing Design
Fire Protection Engineering
Lighting Design
BIM
Sustainability/Resiliency
Low Voltage Electric
Features
Accelerated Schedule
Accessibility
BIM/Revit
C149 / C149A
Certified Study
Feasibility Studies
Historical Renovations
House Doctor
In Construction
In Design
Phased Construction
New Construction
Prime
Occupied
Sustainable
Search

Crispus Attucks Children's Center Upgrades, Dorchester, Mass.

The Crispus Attucks children’s Center is a private, non-profit day care provider operating out of 22,500 SF in two buildings built in the 1960’s and 1970’s. AEI was retained to provide MEP/FP upgrades in both buildings. Repairs began with a complete feasibility study and continued into design and CA for a new HVAC system, fire alarm control panel upgrade, upgraded kitchen grease traps, and window and roof replacements.

OWNER

Crispus Attucks Children's Center

CLIENT

Studio G Architects

CONSTRUCTION COST

$2.3M

SIZE

22,500 SF

AEI SERVICES

Mechanical
Electrical
Plumbing
Fire Protection
Lighting

PHASES OF DESIGN

Feasibility Study
Schematic Design
Design Development
Construction Documents
Construction Administration