Coronavirus Update/ Returning to the Office: AEI now IMEG is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI now IMEG's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.
Markets
Services
Features
Fire Station HVAC System Upgrade, Wellesley, Mass.
Construction was performed during summer months and completed before heating season began in the fall.
As part of the HVAC system upgrade, AEI designed a mechanical system that involved replacing the existing steam boiler with new hot water condensing boilers and a new hot water piping system with variable speed pumps and hot water suspended unit heaters in the apparatus bay. Controls were designed to interlock unit heater operation with overhead door position to reduce energy usage. In order to maintain operations during construction, AEI designed temporary utilities including domestic hot water, electricity, and exterior lighting.