Coronavirus Update/ Returning to the Office: AEI now IMEG is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI now IMEG's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Markets
Adaptive Reuse
Airport
Commercial/Mixed Use
Federal/Military
Healthcare
Higher Education
Historic Renovation
K-12/Daycare
Municipal/DPW
Public Safety
Recreation/Culture
Science/Technology
Structured Parking
Transit
Services
Mechanical Engineering
Electrical Engineering
Plumbing Design
Fire Protection Engineering
Lighting Design
BIM
Sustainability/Resiliency
Low Voltage Electric
Owner's Project Manager
Features
Accelerated Schedule
Accessibility
BIM/Revit
c149
c149A
c25A
Certified Study
Feasibility Studies
Historical Renovations
House Doctor
In Construction
In Design
Phased Construction
New Construction
Prime
Occupied
Sustainable
Search

Fire Station HVAC System Upgrade, Wellesley, Mass.

Construction was performed during summer months and completed before heating season began in the fall.

As part of the HVAC system upgrade, AEI designed a mechanical system that involved replacing the existing steam boiler with new hot water condensing boilers and a new hot water piping system with variable speed pumps and hot water suspended unit heaters in the apparatus bay. Controls were designed to interlock unit heater operation with overhead door position to reduce energy usage. In order to maintain operations during construction, AEI designed temporary utilities including domestic hot water, electricity, and exterior lighting.

OWNER

Town of Wellesley, Mass.

CLIENT

Gale Associates

CONSTRUCTION COST

$191,000

AEI SERVICES

Mechanical
Electrical
Plumbing

PHASES OF DESIGN

Existing Conditions
Feasibility Study
Schematic Design
Design Development
Construction Documents
Construction Administration

PROJECT FEATURES

c149 Filed Sub-bids
Temporary Systems
Occupied and Phased