Coronavirus Update/ Returning to the Office: AEI's is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Markets
Adaptive Reuse
Airport
Commercial/Mixed Use
Federal/Military
Healthcare
Higher Education
Historic Renovation
K-12/Daycare
Municipal/DPW
Public Safety
Recreation/Culture
Science/Technology
Structured Parking
Transit
Services
Mechanical Engineering
Electrical Engineering
Plumbing Design
Fire Protection Engineering
Lighting Design
BIM
Sustainability/Resiliency
Low Voltage Electric
Owner's Project Manager
Features
Accelerated Schedule
Accessibility
BIM/Revit
c149
c149A
c25A
Certified Study
Feasibility Studies
Historical Renovations
House Doctor
In Construction
In Design
Phased Construction
New Construction
Prime
Occupied
Sustainable
Search

Lowell Community Charter School Third Floor Expansion

AEI provided MEP/FP engineering services for portions of the charter school as required for installation of a new elevator and stair. AEI also provided guidance for the existing flue system affected by changes on the third floor. Work also included a new gas-fired water heater with recirculating pump, new boilers, new electrical distribution, and two new, separate sets of male/female restrooms for students and staff.

 

OWNER

City of Lowell

CLIENT

CSS

CONSTRUCTION COST

$2.5M

AEI SERVICES

MEP/FP

PHASES OF DESIGN

Design and CA

PROJECT FEATURES

DDC Controls
Energy Efficiency
Occupant Sensing Lighting
Code Compliance
Accelerated Schedule
Occupied Construction
$30,000 Energy Rebate
c149 Filed Sub-Bids