Coronavirus Update/ Returning to the Office: AEI now IMEG is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI now IMEG's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Markets
Adaptive Reuse
Airport
Commercial/Mixed Use
Federal/Military
Healthcare
Higher Education
Historic Renovation
K-12/Daycare
Municipal/DPW
Public Safety
Recreation/Culture
Science/Technology
Structured Parking
Transit
Services
Mechanical Engineering
Electrical Engineering
Plumbing Design
Fire Protection Engineering
Lighting Design
BIM
Sustainability/Resiliency
Low Voltage Electric
Owner's Project Manager
Features
Accelerated Schedule
Accessibility
BIM/Revit
c149
c149A
c25A
Certified Study
Feasibility Studies
Historical Renovations
House Doctor
In Construction
In Design
Phased Construction
New Construction
Prime
Occupied
Sustainable
Search

DOC Boiler Replacements, Bridgewater, Mass.

Extremely complex and challenging boiler replacement project completed on time throughout a compressed schedule with a hard deadline.

AEI provided engineering services for a study to replace three steam boilers at MCI Bridgewater. Three high-pressure steam boilers exceeded their useful life and needed immediate replacement. The existing dual fuel boilers burned natural gas as their primary fuel source with No. 4 fuel oil as back-up, which is no longer allowed. Additionally, the steam demand on campus changed over time, and the boiler size needed to be reduced to accommodate this. At the completion of this study, AEI designed the replacement boilers on an accelerated schedule in an occupied facility with no downtime. 

OWNER

DCAMM

CLIENT

AEI performed this project as Prime

CONSTRUCTION COST

$7.3M

AEI SERVICES

Mechanical
Electrical
Plumbing

PHASES OF DESIGN

Feasibility Study
Design Development
Construction Administration

PROJECT FEATURES

c149 Filed Sub-bids
Boiler Replacements
Medium and High Voltage
Central Plant
Compressed Schedule
Emergency Response