Coronavirus Update/ Returning to the Office: AEI now IMEG is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI now IMEG's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.
Markets
Services
Features
DOC Boiler Replacements, Bridgewater, Mass.
Extremely complex and challenging boiler replacement project completed on time throughout a compressed schedule with a hard deadline.
AEI provided engineering services for a study to replace three steam boilers at MCI Bridgewater. Three high-pressure steam boilers exceeded their useful life and needed immediate replacement. The existing dual fuel boilers burned natural gas as their primary fuel source with No. 4 fuel oil as back-up, which is no longer allowed. Additionally, the steam demand on campus changed over time, and the boiler size needed to be reduced to accommodate this. At the completion of this study, AEI designed the replacement boilers on an accelerated schedule in an occupied facility with no downtime.