Coronavirus Update/ Returning to the Office: AEI now IMEG is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI now IMEG's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.
Markets
Services
Features
Prospect Hill Academy Charter High School, Cambridge, Mass.
An innovative de-humidification/make-up mechanical system ensures interior comfort throughout the year while realizing substantial operating costs savings.
Prospect Hill Academy is an urban charter high school operating out of a 40,000 SF former archdiocese building. The $6.5M renovation involved MEP/FP upgrades that resulted in a new accessible elevator; new HVAC, plumbing and fire protection systems; lighting and power upgrades to the public and classroom areas; and new electric service. Designed to C149 sub-bid requirements, the mechanical system was designed with innovative de-humidification/make-up air to preserve interior comfort throughout the school year while realizing substantial operating costs savings.