Coronavirus Update/ Returning to the Office: AEI now IMEG is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI now IMEG's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Markets
Adaptive Reuse
Airport
Commercial/Mixed Use
Federal/Military
Healthcare
Higher Education
Historic Renovation
K-12/Daycare
Municipal/DPW
Public Safety
Recreation/Culture
Science/Technology
Structured Parking
Transit
Services
Mechanical Engineering
Electrical Engineering
Plumbing Design
Fire Protection Engineering
Lighting Design
BIM
Sustainability/Resiliency
Low Voltage Electric
Owner's Project Manager
Features
Accelerated Schedule
Accessibility
BIM/Revit
c149
c149A
c25A
Certified Study
Feasibility Studies
Historical Renovations
House Doctor
In Construction
In Design
Phased Construction
New Construction
Prime
Occupied
Sustainable
Search

Prospect Hill Academy Charter High School, Cambridge, Mass.

An innovative de-humidification/make-up mechanical system ensures interior comfort throughout the year while realizing substantial operating costs savings.

Prospect Hill Academy is an urban charter high school operating out of a 40,000 SF former archdiocese building. The $6.5M renovation involved MEP/FP upgrades that resulted in a new accessible elevator; new HVAC, plumbing and fire protection systems; lighting and power upgrades to the public and classroom areas; and new electric service. Designed to C149 sub-bid requirements, the mechanical system was designed with innovative de-humidification/make-up air to preserve interior comfort throughout the school year while realizing substantial operating costs savings.

OWNER

Prospect Hill Academy Charter School

CLIENT

CBT Architects

CONSTRUCTION COST

$6.5M

SIZE

40,000 SF

AEI SERVICES

Mechanical
Electrical
Plumbing
Fire Protection

SUSTAINABILITY

LEED certified equivalent

PROJECT FEATURES

c149 Filed Sub-bids