Markets
Adaptive Reuse
Airport
Commercial/Mixed Use
Federal/Military
Healthcare
Higher Education
Historic Renovation
K-12/Daycare
Municipal/DPW
Public Safety
Recreation/Culture
Science/Technology
Structured Parking
Transit
Services
Mechanical Engineering
Electrical Engineering
Plumbing Design
Fire Protection Engineering
Lighting Design
BIM
Sustainability/Resiliency
Low Voltage Electric
Features
New Construction
Occupied
Accessibility
Accelerated Schedule
BIM/Revit
Certified Study
C149 / C149A
Feasibility Studies
Historical Renovations
Phased Construction
Sustainability
Search

Prospect Hill Academy Charter High School, Cambridge, Mass.

An innovative de-humidification/make-up mechanical system ensures interior comfort throughout the year while realizing substantial operating costs savings.

Prospect Hill Academy is an urban charter high school operating out of a 40,000 SF former archdiocese building. The $6.5M renovation involved MEP/FP upgrades that resulted in a new accessible elevator; new HVAC, plumbing and fire protection systems; lighting and power upgrades to the public and classroom areas; and new electric service. Designed to C149 sub-bid requirements, the mechanical system was designed with innovative de-humidification/make-up air to preserve interior comfort throughout the school year while realizing substantial operating costs savings.

OWNER

Prospect Hill Academy Charter School

Client

CBT Architects

CONSTRUCTION COST

$6.5M

SIZE

40,000 SF

AEI SERVICES

Mechanical
Electrical
Plumbing
Fire Protection

SUSTAINABILITY

LEED certified equivalent

PROJECT FEATURES