Coronavirus Update/ Returning to the Office: AEI's is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Markets
Adaptive Reuse
Airport
Commercial/Mixed Use
Federal/Military
Healthcare
Higher Education
Historic Renovation
K-12/Daycare
Municipal/DPW
Public Safety
Recreation/Culture
Science/Technology
Structured Parking
Transit
Services
Mechanical Engineering
Electrical Engineering
Plumbing Design
Fire Protection Engineering
Lighting Design
BIM
Sustainability/Resiliency
Low Voltage Electric
Owner's Project Manager
Features
Accelerated Schedule
Accessibility
BIM/Revit
c149
c149A
c25A
Certified Study
Feasibility Studies
Historical Renovations
House Doctor
In Construction
In Design
Phased Construction
New Construction
Prime
Occupied
Sustainable
Search

UMass Chan Medical School New Education and Research Building, Worcester, Mass.

AEI provided P/FP design and CA with an early under-slab work package. Work included design of advanced grey water and water-reuse systems; a UV filtration system for stormwater re-use; a fire pump, domestic water booster pumps, and wet and dry sprinkler systems; two separate P/FP pressure zones; and all systems for the vivarium, including cage wash and watering. Coordinated all work around an existing underground utility tunnel.

OWNER

UMass Chan Medical School

CLIENT

ARC | Architectural Resources Cambridge

CONSTRUCTION COST

$201M

SIZE

350,000 SF
20,000 SF Vivarium

AEI SERVICES

P/FP

PHASES OF DESIGN

Design and CA

SUSTAINABILITY

Net Zero Ready
LEED Gold

PROJECT FEATURES

New Construction
High-Rise Biomedical Research Facility
Redundant Utilities & Systems
cGMP Clean Room Suite
Accelerated Schedule
c149A CM@Risk