Coronavirus Update/ Returning to the Office: AEI now IMEG is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI now IMEG's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Markets
Adaptive Reuse
Airport
Commercial/Mixed Use
Federal/Military
Healthcare
Higher Education
Historic Renovation
K-12/Daycare
Municipal/DPW
Public Safety
Recreation/Culture
Science/Technology
Structured Parking
Transit
Services
Mechanical Engineering
Electrical Engineering
Plumbing Design
Fire Protection Engineering
Lighting Design
BIM
Sustainability/Resiliency
Low Voltage Electric
Owner's Project Manager
Features
Accelerated Schedule
Accessibility
BIM/Revit
c149
c149A
c25A
Certified Study
Feasibility Studies
Historical Renovations
House Doctor
In Construction
In Design
Phased Construction
New Construction
Prime
Occupied
Sustainable
Search

University of Massachusetts Electrical Life Safety Upgrades, Amherst, Mass.

Through its prime house doctor contract, AEI designed electrical engineering upgrades to the life safety systems throughout the 219,000 SF Fine Arts Center. The scope included design of a building addition to house the new emergency power generator, construction of new electric rooms throughout the building to house emergency power panels, and replacement of the building fire alarm system, emergency lighting, and egress lighting throughout the building.

OWNER

University of Massachusetts, Amherst

CONSTRUCTION COST

$1.5M

SIZE

219,000 SF

AEI SERVICES

Electrical Engineering

PHASES OF DESIGN

Study and Design

PROJECT FEATURES

Prime House Doctor
Medium and Low Voltage Electrical
Accessibility Upgrades
c149 Filed Sub-Bids
Built 1975