Coronavirus Update/ Returning to the Office: AEI now IMEG is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI now IMEG's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Markets
Adaptive Reuse
Airport
Commercial/Mixed Use
Federal/Military
Healthcare
Higher Education
Historic Renovation
K-12/Daycare
Municipal/DPW
Public Safety
Recreation/Culture
Science/Technology
Structured Parking
Transit
Services
Mechanical Engineering
Electrical Engineering
Plumbing Design
Fire Protection Engineering
Lighting Design
BIM
Sustainability/Resiliency
Low Voltage Electric
Owner's Project Manager
Features
Accelerated Schedule
Accessibility
BIM/Revit
c149
c149A
c25A
Certified Study
Feasibility Studies
Historical Renovations
House Doctor
In Construction
In Design
Phased Construction
New Construction
Prime
Occupied
Sustainable
Search

Weston DPW, Weston, Mass.

The Weston DPW project was honored with a project achievement award by the Construction Management Association of America, New England Chapter.

AEI provided all MEP/FP design and CA services for the demolition and reconstruction of the Weston DPW. The new, two-building facility includes an 18,400 SF vehicle equipment operations garage with a vehicle wash bay and vehicle and equipment storage spaces, and a 23,500 SF operations building with administrative offices, employee support spaces, workshops, and vehicle maintenance operations areas. The site contains parking, a fueling facility, and a material storage bin area. AEI incorporated acoustic criteria into the mechanical equipment designs to mitigate noise impact in adjacent residential areas and designed a geothermal HVAC system to reduce energy costs by 18%. AEI also designed radiant heating in the maintenance and storage areas, energy recovery rooftop units, daylighting, and a waste oil supplemental heating system.

OWNER

Town of Weston, Mass.

CLIENT

Weston & Sampson

CONSTRUCTION COST

$16M

SIZE

41,900 SF

AEI SERVICES

Mechanical
Electrical
Plumbing
Fire Protection

PHASES OF DESIGN

Design Development
Construction Documents

SUSTAINABILITY

LEED Certified

PROJECT FEATURES

New Construction
Vehicle Maintenance Facility
Geothermal HVAC Design
Daylighting
$23,000 Utility Rebates
Sustainable