Coronavirus Update/ Returning to the Office: AEI now IMEG is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI now IMEG's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Weston Case Elementary School Campus Masterplan and Pedestrian Walkways, Weston, Mass.

AEI now IMEG performed parking lot, site and roadway lighting for the Case House parking area, inner pedestrian loop, and landscaping, that includes uplighting of trees in the arboretum area. The Weston Case campus includes a community center, library, field house, parking lots, and walking paths for this suburban elementary school

MSBA Lunenburg Middle/High School, Lunenburg, Mass.

AEI now IMEG provided plumbing and fire protection design and CA for the new construction of a middle and high school in Lunenburg. The project includes a full kitchen/cafeteria, science laboratories, restrooms, locker and shower rooms, and an early work package for underslab piping. AEI now IMEG reviewed and approved the cost estimate for plumbing … Read more

MSBA Accelerated Repairs Finn Elementary School Boiler Replacement, Southborough, Mass.

AEI provided MEP and lighting design and CA for documenting and specifying all work associated with replacing two hot water oil-fired boilers, fuel pumps and piping inside the boiler room. Floor drains were relocated for the new layout and power was provided to new mechanical and plumbing equipment, which was connected to the central Automated … Read more

MSBA ARP Nashoba Valley High School Roof, Window and Boiler Replacements, Westford, Mass.

Through the MSBA ARP program, AEI replaced existing rooftop units and roof drains, extended and rerouted mounted piping to support the roof replacement, added electrical service receptacles and outdoor lighting, and provided power to new and reinstalled mechanical equipment. AEI also investigated options to replace a gas-fired hot water boiler and all auxiliary mechanical equipment.

MSBA ARP Worcester Schools Roof, Window and Door Replacements, Worcester, Mass.

AEI provided MEP/FP engineering services for window, roof and exterior door replacements at three Worcester elementary schools. The scope involved converting existing spaces into ADA-compliant restrooms, exterior door ADA upgrades and electric snow melting systems on all ADA ramps, new window AC and HVAC systems, LED Egress lighting, fire alarm upgrades with voice activation and … Read more

MSBA ARP Quincy Schools Roof, Windows and Wall Replacements, Quincy, Mass.

AEI provided an existing conditions assessment and schematic design for establishing the budget with the MSBA and the City of Quincy, and construction documents to aid in roof replacement. Due to the age and condition of mechanical equipment and roof drains/piping, all equipment was replaced with new, and all electrical equipment on the roof was … Read more

MSBA Green Repairs, Brockton Schools Roof and Boiler Replacement Projects

AEI performed MEP engineering services to replace eight roofs at various public schools. AEI documented and specified the replacement of existing roof drains and existing ductwork affected but unable to be reasonably reused. AEI also designed the replacement for steam boilers in the East and North Junior High Schools, including modifications to the gas piping … Read more

Lowell Community Charter School Third Floor Expansion

AEI provided MEP/FP engineering services for portions of the charter school as required for installation of a new elevator and stair. AEI also provided guidance for the existing flue system affected by changes on the third floor. Work also included a new gas-fired water heater with recirculating pump, new boilers, new electrical distribution, and two … Read more

MSBA ARP Campbell Elementary School

AEI provided MEP services for windows, door and boiler replacement and accessibility upgrades at Campbell Elementary School. Evaluation and schematic design services include upgrades to the kitchen and restroom facilities and building envelope. Providing existing conditions analysis, explanation of a proposed solution, and confirmation that this solution meets applicable energy codes.

Crispus Attucks Children’s Center Upgrades, Dorchester, Mass.

The Crispus Attucks children’s Center is a private, non-profit day care provider operating out of 22,500 SF in two buildings built in the 1960’s and 1970’s. AEI was retained to provide MEP/FP upgrades in both buildings. Repairs began with a complete feasibility study and continued into design and CA for a new HVAC system, fire … Read more