Coronavirus Update/ Returning to the Office: AEI's is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Crispus Attucks Children’s Center Upgrades, Dorchester, Mass.

The Crispus Attucks children’s Center is a private, non-profit day care provider operating out of 22,500 SF in two buildings built in the 1960’s and 1970’s. AEI was retained to provide MEP/FP upgrades in both buildings. Repairs began with a complete feasibility study and continued into design and CA for a new HVAC system, fire … Read more

Assabet Valley Vocational Technical High School, Marlborough, Mass.

AEI provided electrical engineering services related to the testing and evaluation of electrical feeders in the existing 410,000 SF high school. The study assessed the feasibility of reusing feeders for the unit substations and panelboards, and determined the necessity of electrical upgrades including switchboard and panelboard replacements. Design involved lighting, power and emergency power generation … Read more

Edith C. Baker Elementary School, Brookline, Mass.

The Edith C. Baker Elementary School is an 80,000 SF elementary school that underwent an $8M renovation and added a new cafeteria, a new library, three new classrooms, and an auxiliary gymnasium. Architectural Engineers provided mechanical, electrical, plumbing and fire protection design and construction administration services. The scope of the renovation included upgrade and replacement … Read more

Brooke 2 Charter School, Mattapan, Mass.

Brooke 2 Charter School is an urban charter school providing an elementary education to students in levels K-8. AEI provided sustainable mechanical, electrical, plumbing and fire protection design services for a full, 57,000 SF renovation that included the replacement of the electrical distribution system as well as internal and site lighting and the installation of … Read more

Prospect Hill Academy Charter High School, Cambridge, Mass.

Prospect Hill Academy is an urban charter high school operating out of a 40,000 SF former archdiocese building. The $6.5M renovation involved MEP/FP upgrades that resulted in a new accessible elevator; new HVAC, plumbing and fire protection systems; lighting and power upgrades to the public and classroom areas; and new electric service. Designed to C149 … Read more

Fenway High School Addition & Renovation, Boston, Mass.

AEI provided MEP/FP design for the 70,000 SF partial renovation and 7,000 SF cafeteria/kitchen addition in this urban Boston high school. Work included select building system replacements, including HVAC, electrical distribution, new lighting controls, tel/data, security, fire alarm, plumbing and fire protection systems. New fire protection and fire alarm systems comply with NFPA 13, 14 … Read more