Coronavirus Update/ Returning to the Office: AEI's is in the process of preparing our office for staff to return on a modified schedule, providing the City of Boston re-opening guidelines continue to move forward. During quarantine, AEI's staff have successfully worked remotely. Every staff member is equipped with the same equipment at home as they have in the office to ensure efficiency and seamless transitions between workstations. We will continue to work remotely and will provide a formal reopening date when it's available. At this time, only staff will be allowed in our space. Our contact information and policies on in person meetings and site visits remain the same as they have since early March. Please feel free to contact us if you have questions.

Arlington Community Safety Building, Arlington, Mass.

After completing a masterplan that involved an inspection of existing systems and the conceptual identification of required upgrades and cost estimates, Architectural Engineers commenced MEP/FP design and CA services in two phases to allow continued occupancy throughout construction. The ADA compliant building features holding cells with a sally port, a fitness center, a briefing room/training … Read more

Fire Station HVAC System Upgrade, Wellesley, Mass.

As part of the HVAC system upgrade, AEI designed a mechanical system that involved replacing the existing steam boiler with new hot water condensing boilers and a new hot water piping system with variable speed pumps and hot water suspended unit heaters in the apparatus bay. Controls were designed to interlock unit heater operation with … Read more

DOC Boiler Replacements, Bridgewater, Mass.

AEI provided engineering services for a study to replace three steam boilers at MCI Bridgewater. Three high-pressure steam boilers exceeded their useful life and needed immediate replacement. The existing dual fuel boilers burned natural gas as their primary fuel source with No. 4 fuel oil as back-up, which is no longer allowed. Additionally, the steam … Read more